|
Sunday, 03 June 2007 |
|
With ballot papers in the Deputy Leadership election due to be posted out later this week, the LabOUR Commission has devised an A4 (landscape) leaflet setting out its 10-point plan for Renewal. Pages 1 and 4 can be downloaded here Pages 2 and 3 can be downloaded here Printed back to back they form an A4 folded leaflet.
|